2010-2012 |
|
|
|
| |
DESCRIPTION |
CLIENT |
OWNER |
DATE |
| |
Electrical & Instrument Installation APNE PHE Arco Java Sea Offshore |
PT Punjj Lloyd Indonesia |
PT. Pertamina Hulu Energy |
Nov'11 -
Jul;12
|
| |
E & I Onshore Fabrication APNE & F Bakrie Construction, Cilegon |
PT Punjj Lloyd Indonesia |
PT. Pertamina Hulu Energy |
Nov'11 -
Jan'12 |
| |
Hook up Offshore Installation Field Development Project Phase 1 & 2 at South Mahakam |
PT Nippon Steel Construction Indonesia |
Total Indonesia |
Nov'10 |
| |
Commissioning, Calibration & Testing of Gas Panel and Gas Detectors |
Guardfire System (Thailand) |
PLN |
Jun'11 |
| |
Test and commissioning for water spray
system, Muara Tawar project |
Guardfire System (Thailand) |
PLN |
May'11 |
| |
Test and commissioning for water spray
system, Muara Tawar Project |
Guardfire System (Thailand) |
PLN |
Mar'11 |
| |
Maintenance works for total shutdown |
Toba Pulp Lestari |
Toba Pulp Lestari |
Nov'10 |
| |
Installation and supply of support and mimic panel for fire alarm system |
Guardfire System (Thailand) |
PLN |
Oct'10 |
| |
Construction of electrical, instrument,
telecommunication, fire protection for buiding
module,PG module, MSF and bridge module
on ICPR-2 process platform project |
Gunanusa Utama Fabrikator |
ONGC Ltd (India) |
Jul'10 -
Feb'11 |
| |
Manpower supply and technical skils |
Nippon Steel Indonesia |
ConocoPhillips Indonesia |
Mar'10 -
Apr '11 |
| |
Installation fiber optic and power cable for
DCS upgrading |
Honeywell Indonesia |
Chevron Pacific Indonesia |
Mar'10 - Jan'11 |
| |
Installation and supply of electrical and instrument bulk material |
Endress Hauser Indonesia |
Torganda Palm
Oil Refinery |
Mar'10 -
Dec'11 |
| |
Installation instrument and function test |
Kuarta |
Medco E&P |
Mar'10 -
Jun'10 |
| |
|
|
|
|
| |
2008-2010 |
|
|
|
| |
Installation, modification and testing of
6 units of automatic tank gauging system
for IMG Belawan |
Endress Hauser Indonesia |
Pertamina Belawan |
Dec'09 -
Dec'10 |
| |
Instrument calibration for Tuban field |
Honeywell Indonesia |
Medco Energi Indonesia |
Dec'09 -
Jan'10 |
| |
Instrument calibraton for SCADA
field equipment |
Honeywell Indonesia |
Medco Energi Indonesia |
Dec'09 -
Mar'10 |
| |
Electrical, fire protection, MATV, CCTV,
telephone system for Kuroshio K1
refurbishment - barge service |
Nippon Steel Indonesia (Batam) |
Kuroshio Barge |
Jun'09 -
Nov'09 |
| |
Instalation and supply material for
lighting arrester |
Citra Panji Manunggal |
Pertamina Semarang |
Apr'09 -
Nov'09 |
| |
Panel installation for Ngimbang sub station,
Jawa Timur |
Asia Sarana Tehnik/Areva T&D |
PLN Ngimbang |
Dec'08 -
Mar'09 |
| |
Maintanance total shut down, mechanical, electrical and instrument |
Toba Pulp Lestari |
Toba Pulp Lestari |
Sep'08 -
Oct'08 |
| |
Manpower supply for barge Kuroshio I, barge
CB-3, barge Dupa 8 for Peciko 5 project |
Nippon Steel Construction Indonesia |
Total EP Indonesia |
Jul'08 |
| |
Testing commissioning electrical and
instrument works for North Belut project |
Nippon Steel Batam |
ConocoPhillips Indonesia |
Mar'08 -
Nov'08 |
| |
|
|
|
|
| |
2006-2007 |
|
|
|
| |
Modification and cable repair at MWPN
platform for Sisi Nubi project |
Nippon Steel Indonesia |
Total EP Indonesia |
Sep'07 -
Dec'07 |
| |
Hook-up offshore for civil, structural,
mechanical, electrical and instrumentation
at MWPN, MWPN2, WPS platforms for
Sisi Nubi project |
Nippon Steel Indonesia |
Total EP Indonesia |
Mar'07 -
Jul'07 |
| |
Installation field instrument for ISBL, USBI, steam boiler B-01 |
Golden Pratama Indonesia |
Petrokimia Gressik |
Jan'07 -
Jun'07 |
| |
Wiring installation from PB OPTO coupler
card to marshalling I/O |
Yokogawa Indonesia |
Holcim Cement Cibinong |
Oct'06 -
Nov'06 |
| |
Installation field instrument H2S/TS Analizer
and Total Sulphur |
SAS Indonesia |
Conoco Phillips Indonesia |
Sep'06 -
Jan'07 |
| |
Manpower supply for pulling cable
and installation |
Yokogawa Indonesia |
Holicim Cement Cilacap |
Oct'06 -
Nov'06 |
| |
Supply Electrical and Instrument engineer
and mechanical engineer expatriate for
Sisi Nubi Project |
Nippon Steel Indonesia |
Total EP Indonesia |
Oct'06 |
| |
Maintenance works for Total shutdown |
Toba Pulp Lestari |
Toba Pulp Lestari |
August'06 |
| |
Design and supply junction box EEX
class 1 div 2- KILLARK |
Aka Engineering |
Total EP Indonesia |
Mar'06 |
| |
Installation electrical and instrumentation
c/w testing & commisioning for DPCS & ZEP
Platform CNOOC project |
Arindo/Joy Industry |
Timas |
Feb'06 - Apr'06 |
| |
Installation fiber optic for AGX and
ANOA platform |
Honeywell Indonesia |
Premier Oil |
Apr'06 |
| |
Installation field instrument for upgrading
DCS system at Zamrud Siak |
Honeywell Indonesia |
Siak Pusaka Zamrud |
Jun'06 -
Jul'06 |
| |
Manpower supply senior electrical
and instrument engineers |
Nippon Steel Indonesia |
BP Indonesia |
May'06 -
Oct'06 |
| |
Manpower supply senior electrical
and instrument engineers |
Technip Indonesia |
Unocal Indonesia |
Apr'06 -
Jun'06 |
| |
|
|
|
|
| |
2003-2005 |
|
|
|
| |
Manpower supply for construction offshore
BP Esa Reactivation and BIC Finfan Coolers
replacement British Petroleum project |
Nippon Steel Indonesia |
BP Indonesia |
Sep'06 |
| |
Supply, design and installation electrical
equipment such as transformer, power
distribution panel, cable transmission line,
lighting pole for Base camp KUFPEC
Bula - Ambon |
Samudra Ferro Engineering |
Kufpec Indonesia |
Feb'05 -
May'05 |
| |
Detail engineering and installation and field
instrument for Desander and Sand
Collection Skid |
Arindo / Joy Industries |
Unocal Indonesia |
Sep'06 |
| |
Calibration instrument works for Lawe-Lawe
oil/gas separator project |
Promatcon |
Unocal Indonesia |
Sep'06 |
| |
Installation field Instrument for Lawe-Lawe
oil/gas separator project |
Promatcon |
Unocal Indonesia |
May'04 |
| |
Installation, loop check and commisioning
of air monitoring units in Hangtuah platform |
ConocoPhillips Indonesia |
ConocoPhillips Indonesia |
Mar'04 |
| |
Construction electrical and instrument of
Badak VLP Gas compression phase 2 |
Kaliraya Sari |
Vico Indonesia |
Mar'04 -
Oct'04 |
| |
Installation fire alarm system |
Siemens Indonesia |
Cognis & others |
Feb'04 -
Apr'04 |
| |
Installation flame detector and supply for
Libo and Pager Area |
Honeywell Indonesia |
Caltex Pacific Indonesia |
Jan'04 |
| |
Design and fabrication interposting relay panel |
Technip Indonesia |
Total EP Indonesia |
Jan'04 |
| |
Re-instrumentation upgrading DCS for Sei.
Pakning oil and gas for pertamina |
Honeywell Indonesia |
Pertamina UP II Dumai |
Feb'04 - Dec'04 |
| |
Installation instrument fieldbus and
upgrading DCS for Libo Gathering station
and test station Caltex |
Honeywell Indonesia |
Caltex Pacific Indonesia |
Dec'03 -
Feb'04 |
| |
Retrofit upgrading DCS for CDU II, III, IV
for Sei. Gerong Pertamina |
Yokogawa Indonesia |
Pertamina UP III
Palembang |
Sep'03 -
Mar'04 |
| |
|
|
|
|
| |
© 2001 - 2014 Sinar Mulia. All Rights Reserved. |
|
|
|