2011 |
|
|
|
| |
DESCRIPTION |
CLIENT |
OWNER |
DATE |
| |
Supply flange, pressure gauge and instrument
bulk material for Muara Tawar project |
Truba Alam Manunggal Engineering |
PLN |
May'11 |
| |
Rental calibration equipment |
Kuarta Powerindo Perkasa |
Pertamina JOB - Talisman |
May'11 |
| |
Supply valve and instrument material
Muara Tawar project |
Guardfire System (Thailand) |
PLN |
May'11 |
| |
Supply fiber optic and fire resistant cables,
Muara Tawar project |
Jurong Engineering Lestari |
PLN |
Apr'11 |
| |
Supply fire fighting and piping material |
Truba Alam Manunggal Engineering |
PLN |
Mar'11 |
| |
Supply lighting fixture pole and accessories |
Citic Seram Energy Ltd |
Citic Seram Energy Ltd |
Mar'11 |
| |
Supply fire fighting and piping material |
Truba Alam Manunggal Engineering |
PLN |
Mar'11 |
| |
Supply fiber optic and fire resistant cables,
Muara Tawar project |
Guardfire System (Thailand) |
PLN |
Feb'11 |
| |
|
|
|
|
| |
2010 |
|
|
|
| |
Supply fiber optic and fire resistant cables,
Muara Tawar project |
Jurong Engineering Lestari |
PLN |
Sep'10 |
| |
Supply fire fighting and piping material |
Truba Alam Manunggal Engineering |
PLN |
May'10 |
| |
Supply of conduit and fittings |
Millway Engineering |
Millway Engineering |
May'10 |
| |
Supply marshalling panel |
Honeywell Indonesia |
Chevron Pacific Indonesia |
Mar'10 |
| |
Supply bulk material (power pable, cable fiber optic, cable tray, cable gland and fuse) |
Honeywell Indonesia |
Chevron Pacific Indonesia |
Mar'10 |
| |
Rental calibration equipment |
Honeywell Indonesia |
Honeywell Indonesia |
Feb'10 -
Mar'10 |
| |
|
|
|
|
| |
2009 |
|
|
|
| |
Supply flanges, valves |
SAS Niaga |
Total EP Indonesia |
Dec'09 |
| |
Supply special piping material, flanges, valves |
SAS Niaga |
Total EP Indonesia |
Oct'09 |
| |
Supply material for Peciko 5 project |
SAS Niaga |
Total EP Indonesia |
Jun'09 |
| |
Supply bulk material |
Citra Panji Manunggal |
Pertamina |
Apr'09 |
| |
Supply of tools and equipment for
Hang Tuah project |
Bakrie Construction |
ConocoPhillips Indonesia |
Apr'09 |
| |
Supply material for Tie-in lbs for
cable transmission |
Citic Seram Energy Limited |
Citic Seram Energy Limited |
Apr'09 |
| |
Supply of tools and equipment for welding, fabrication and construction offshore services |
Bakrie Construction |
ConocoPhillips Indonesia |
Feb'09 |
| |
|
|
|
|
| |
2004-2008 |
|
|
|
| |
Supply lighting fixture pole and accessories |
Citic Seram Energy Limited |
Citic Seram Energy Limited |
Sep'08 - Nov'08 |
| |
Supply special piping material, flanges, valves |
Citic Seram Energy Limited |
Citic Seram Energy Limited |
Aug'08-Oct'08 |
| |
Supply bulk material for Belilas Indragiri
Hulu project |
Transportasi Gas Indonesia |
Transportasi Gas Indonesia |
Jun'06 |
| |
Supply instrument bulk for Mutiara Oil/gas project |
Rekayasa Industri |
Vico Indonesia |
Apr'04 |
| |
|
|
|
|
| |
© 2001 - 2014 Sinar Mulia. All Rights Reserved. |
|
|
|